Marathon Oil - Norway, Alviehm FPSO Project

| Location: | Norway |
|---|---|
| Owner: | Marathon Oil Company |
| Lead Contractor: | Vetco Aibel |
| Value: | US $6,000,000 |
| Peak Manpower: | 45 |
| Duration/Finish: | March 07 – Dec 07 (approx.) |
| Description: | Electrical and Instrument Commissioning Services |
Scope of Work:
Kentz scope on the Alvheim project began with general instrument and electrical systems verification and loop check. However, as the Kentz commissioning support team established themselves at site and became more familiar with the various scopes involved with the topsides, they were assigned full responsibility for complete verification and pre-commissioning associated with specific systems packages, e.g. HVAC, VCM (ICMS).