Sandoz IL-3 Production Plant - Ringaskiddy
| Location: | Ireland |
|---|---|
| Owner: | Sandoz |
| Lead Contractor: | United Engineers & Constructors |
| Value: | US $1,500,000 |
| Peak Manpower: | 18 |
| Duration/Finish: | 10 months/1995 |
| Description: | Electrical and Instrumentation Scope for the IL-3 Production Plant |
Scope of Work:
Project Management, Procurement of Bulk Materials, Supervision, Installation, Pre-commissioning, Commissioning and Testing of the Electrical and Instrumentation scope for the Sandoz IL-3 Plant at Ringaskiddy.
The Electrical scope included LV Switchgear and Motor Control Centres, Transformers, LV Power Distribution, Primary & Secondary Cable Support Systems, Grounding & Lightning Protection, Motive Power and Control Cabling, Plant Lighting, Plant Utility Power, DC UPS Systems and Trace Heating.
The Instrumentation scope included Control & Instrument Cabling, Field Junction Boxes, Field Instruments, Process & Pneumatic Hook-ups, Instrument Calibration and Loop-Checking, Building Management Systems, Fire Detection, Public Address and Communication Systems.