What We Do

 

Rabigh Power Plant - Combined Cycle Phase

Rabigh Power Plant - Combined Cycle Phase
Location: Saudi Arabia
Owner: SCECO West
Lead Contractor: Fluor Daniel
Value: US $10,000,000
Peak Manpower: 500
Duration/Finish: 10 months/1998
Description: 380MW Combined Cycle Power Plant
Scope of Work:

Supervision, Procurement, Material Supply, Installation, Testing and Commissioning for the Electrical and Instrumentation scope associated with the combined cycle operation. Works included the Steam Turbine Power Island, Protection Metering and Alarm Cubicles, Bailey DCS, BOP instrumentation, 4160V Substation, Transformers and Busduct, 380kV Cable Installation including the provision of assistance to the manufacturer during termination, Turbine Erection Supervision, Start-up and Commissioning of Turbines, Boilers, Instrument and Control Systems, Supply bulk electrical and instrument materials, cables, cable tray, instrument fittings, JBs, etc.