Rabigh Power Plant - Combined Cycle Phase

| Location: | Saudi Arabia |
|---|---|
| Owner: | SCECO West |
| Lead Contractor: | Fluor Daniel |
| Value: | US $10,000,000 |
| Peak Manpower: | 500 |
| Duration/Finish: | 10 months/1998 |
| Description: | 380MW Combined Cycle Power Plant |
Scope of Work:
Supervision, Procurement, Material Supply, Installation, Testing and Commissioning for the Electrical and Instrumentation scope associated with the combined cycle operation. Works included the Steam Turbine Power Island, Protection Metering and Alarm Cubicles, Bailey DCS, BOP instrumentation, 4160V Substation, Transformers and Busduct, 380kV Cable Installation including the provision of assistance to the manufacturer during termination, Turbine Erection Supervision, Start-up and Commissioning of Turbines, Boilers, Instrument and Control Systems, Supply bulk electrical and instrument materials, cables, cable tray, instrument fittings, JBs, etc.