BCL Selebe Phikwe Smelting Plant Rebuild

| Location: | Botswana |
|---|---|
| Owner: | Bamangwato Concessions Ltd |
| Lead Contractor: | Kentz |
| Value: | US $35,000,000 |
| Peak Manpower: | 2000 |
| Duration/Finish: | 6 months |
| Description: | 7 Yr Smelter Plant Rebuild |
Scope of Work:
- The planning and preparation phase included identification, resource planning, pre-fabrication, subcontractor selection and material supply.
- Demolition and Rebuild of a 300T flash smelting furnace.
- Removal and replacement of Drying Plant Stacks.
- The complete overhaul of 2 x40T Electric Arc Furnaces.
- Renewal of large and small bore piping.
- Overhaul of heat exchangers.
- Refurbishment Waste Heat Boiler (40% retube).
- Replacement of feed conveyors & hoppers.
- Pendant renewals.
- Steam drum repairs and piping repairs.