BCL Selebe Phikwe Smelting Plant Rebuild

BCL Selebe Phikwe Smelting Plant Rebuild
Location: Botswana
Owner: Bamangwato Concessions Ltd
Lead Contractor: Kentz
Value: US $35,000,000
Peak Manpower: 2000
Duration/Finish: 6 months
Description: 7 Yr Smelter Plant Rebuild
Scope of Work:
  • The planning and preparation phase included  identification, resource planning, pre-fabrication, subcontractor selection and material supply.  
  • Demolition and  Rebuild of a 300T flash smelting furnace.
  • Removal and replacement of Drying Plant Stacks.
  • The complete overhaul of 2 x40T Electric Arc Furnaces.
  • Renewal of large and small bore piping.
  • Overhaul of heat exchangers.
  • Refurbishment Waste Heat Boiler (40% retube).
  • Replacement of feed conveyors & hoppers.
  • Pendant renewals.
  • Steam drum repairs and piping repairs.