OGD Phase III

| Location: | Abu Dhabi |
|---|---|
| Owner: | GASCO |
| Lead Contractor: | Bechtel Eastern |
| Value: | US $20,600,000 |
| Peak Manpower: | 970 |
| Duration/Finish: | 18 months/2007 |
| Description: | Electrical, Instrumentation and Telecommunications and SCADA installation works |
Scope of Work:
Project management, field engineering support, electrical, instrument, telecoms and SCADA installation services. The site is adjacent to the existing OGD I and II facilities, both being projects where UTS Kent was previously involved.
The telecommunications scope involves installation and pre-commissioning of CCTV, PA, radio, structured cabling, telephone systems and all associated copper and fibre optic cabling.
The SCADA scope of work involves the removal of the existing Remote Telemetry Units (RTUs) and replacement of these with new RTUs and associated radio masts at each of the existing 189 wellhead locations.
UTS Kent will also purpose build a 1,000-man facility for utilisation during the project