ISCOR Twin Stand Temper Mill Electrical and Control Upgrade
| Location: | Vanderbijlpark, South Africa |
|---|---|
| Owner: | ISCOR Flat Steel Products |
| Lead Contractor: | |
| Value: | The project was awarded at R18.8M on a fixed price lump sum basis |
| Peak Manpower: | 48 |
| Duration/ Finish: | 14 months/2001 |
| Description: | The existing mill was commissioned in 1968 and while mechanically sound, the ISCOR requirement was that the existing obsolete electrical and control systems be upgraded with the most up-to-date technology. |

Scope of Work:
Complete design, procurement, construction, commissioning and start-up on a turnkey basis including the following:
- 11 kV Distribution system including switchgear, transformers and cabling.
- LV Distribution including MCCs and cable management systems.
- DC drives and associated control system.
- New control room.
- Replace the existing master control system with PLCs.
- SCADA system.
- New operator desks and man machine interface terminals.
- Connection to level 2/3 MIS.
- Replace inter stand tension control system, elongation system and roll force measurement systems.
- Install new field instrumentation.
- Removal of redundant equipment.
- Operator and maintenance personnel training.
- O&M manual compilation.