Oryx GTL Plant
| Location: | Qatar |
|---|---|
| Owner: | Oryx GTL |
| Lead Contractor: | Technip-Coflexip |
| Value: | US $6,100,000 |
| Peak Manpower: | 240 |
| Duration/Finish: | 10 months/2006 |
| Description: | Instrumentation Scope |
Scope of Work:
Project Management, Planning, Procurement (Bulks), Site Engineering, Supervision, Installation, Pre-Commissioning and Commissioning of the Instrumentation scope.
The instrumentation scope includes Control Room Equipment, Analysers, Control Valves, Instrument Cable, Primary and Secondary Cable Support Systems, Field Instruments, Process & Pneumatic Hook-ups, Instrument Calibration and Loop-Checking (16,000 Loops).