Oryx GTL Plant

 
 
Location:Qatar
Owner:Oryx GTL
Lead Contractor:Technip-Coflexip
Value: US $6,100,000
Peak Manpower:240
Duration/Finish:10 months/2006
Description: Instrumentation Scope
Scope of Work:       

Project Management, Planning, Procurement (Bulks), Site Engineering, Supervision, Installation, Pre-Commissioning and Commissioning of the Instrumentation scope.

The instrumentation scope includes Control Room Equipment, Analysers, Control Valves, Instrument Cable, Primary and Secondary Cable Support Systems, Field Instruments, Process & Pneumatic Hook-ups, Instrument Calibration and Loop-Checking (16,000 Loops).