Trinidad LNG Expansion Project
| Location: | Trinidad |
|---|---|
| Owner: | Atlantic LNG Company |
| Lead Contractor: | Bechtel |
| Value: | US $13,000,000/train |
| Peak Manpower: | 450 |
| Duration/Finish: | 14 months/train (2006) |
| Description: | Electrical and Instrumentation scope of New Trains 2, 3 and 4 |

Scope of Work:
Supervision, Installation, Pre-commissioning, Commissioning, and Testing for the Electrical and Instrumentation scope of New Trains 2, 3 and 4 and the tie-ins to the existing Train 1 facility. The scope included Substations, HV and LV Reticulation, On-Plot Cabling, Control Equipment Installation, Instrument Installation, Calibration and Loop-checking. Kentz was awarded safety awards for its contribution towards safety excellence on the project.