CSPC Nanhai Petrochemicals Complex Project
| Location: | China |
|---|---|
| Owner: | CNOOC Shell |
| Lead Contractor: | Bechtel/Sinopec Eng/Foster Wheeler |
| Value: | US $16,200,000 |
| Peak Manpower: | 160 |
| Duration/Finish: | 21 months/2005 |
| Description: | Engineering, Procurement and Construction of the Plant-wide Telecommunications & Security |

Scope of Work:
Engineering, Procurement and Construction of the Plant-wide Telecommunications Package including the following work packages:
- Closed Circuit Television System
- Access Control/Security System
- Telephone System (PABX)
- Public Address and General Alarm System
- WAN/LAN Data System
- SDH Transmission System - Trunked & Marine
- Radio System
- Plant-wide Fibre Optic Network
- Line of Sight System
- Master Clock System
- Meteorological System
- Mooring System/Berthing Aid System