Xstrata Goedgevonden Stackers
| Location: | Goedgevonden, Ogies, South Africa |
|---|---|
| Owner: | XstrataCoal |
| Lead Contractor: | Kentz Integrated Solutions |
| Value: | R8m (US$ 1m) |
| Peak Manpower: | 300 |
| Duration/Finish: | June 2009 |
| Description: | EPC for 2 stackers |

Scope of Work:
The scope of work consists of the following:
Complete EPC and startup on a turnkey basis including:
525V distribution including MCC’s and cabling
AC drives
Operator desks and man machine interface terminals
Field instrumentation
Quality assurance and quality control to the customer’s requirements
Procurement and manufacture of all equipment to client specification
Construction
Commissioning assistance