UPS Replacement for Control Room

 
 
Location:Secunda, South Africa
Owner:Sasol Synfuels, duly represented by Sasol Technology
Lead Contractor:Kentz Integrated Solutions
Value:R 3,175,000 (US$ 396,875M)
Peak Manpower:20
Duration/Finish:4 months/September 2009
Description:Brownfield’s project

Scope of Work:

EPC of entire scope of work, which includes the following:

-Detail design of UPS system to be installed in the Refinery east basement

-Supply and install 100kVA UPS units with battery bank and battery stands
-Full testing of 100kVA UPS units before shipment to site, including total load and overload conditions
-Disconnection and removal of existing IPM 150kVA UPS units, associated panels, and equipment from the basement of the control room.
-Placement of new UPS equipment and associated equipment into the basement
-All rigging for adding and removing equipment from basement
-Supply and install all required cables, racking and earthing
-Disconnection, removal and disposal of existing batteries from control room basement. Supply of approved disposal certificate to Sasol Technology.