Propylene Starvation
| Location: | Secunda, South Africa |
|---|---|
| Owner: | Sasol Synfuels, duly represented by Sasol Technology |
| Lead Contractor: | Kentz Integrated Solutions |
| Value: | R 3,625,000 (US$ 4.5m) |
| Peak Manpower: | 30 |
| Duration/Finish: | 4 months/30 September 2009 |
| Description: | Brownfield's project |
Scope of Work:
EPC for the complete civils, mechanical and piping (entire scope of project)
The following work is performed on pase4, Trains 1 & 2 Rectisol East, Unit 212 during the September 2009 shutdown:
-Foundations and steelwork to support new piping
-Replace 3” level control valve with 4” level control valve
-Increase 3” section of pipe to 4”
-Replace 3” gate valve with 4” gate valve
-Replace 6” piping and gate valve with 8” valve and piping
-Supply fabricate and construct one nickel 3½ flange
-Hydro testing of all new lines