Petrokemya – LLDPE Seawater Cooling Header System
| Location: | Jubail, Saudi Arabia |
|---|---|
| Owner: | SABIC - KEMYA |
| Lead Contractor: | Kentz Engineering International Co. Ltd (KEIL) |
| Value: | US $250,000,000 |
| Peak Manpower: | 21 |
| Duration/Finish: | 9 months/2008 |
| Description: | Conceptual and FEED design |
Scope of Work:
The scope of work involves engineering services required to develop the conceptual and detailed design including site surveys, drawing retrieval, basic design concepts, tie-ins and constructability reviews.
The engineering deliverables are summarised as follows:
- Develop a basic design package. This includes all calculations, e.g.: hydraulics, pump sizing, tie-ins, PFD, P&IDs, plot plan, electrical single line diagrams etc.
- Perform route survey for the proposed location
- Perform cost estimate
- Finalise source of power supply and complete ETAP study
- Site survey report
- Prepare ITBs
- Conduct HAZOP and SIL