Petrokemya – LLDPE Seawater Cooling Header System

 
 
Location:Jubail, Saudi Arabia
Owner:SABIC - KEMYA
Lead Contractor:Kentz Engineering International Co. Ltd (KEIL)
Value:US $250,000,000
Peak Manpower:21
Duration/Finish:9 months/2008
Description:Conceptual and FEED design

Scope of Work:

The scope of work involves engineering services required to develop the conceptual and detailed design including site surveys, drawing retrieval, basic design concepts, tie-ins and constructability reviews.

The engineering deliverables are summarised as follows:

  • Develop a basic design package. This includes all calculations, e.g.: hydraulics, pump sizing, tie-ins, PFD, P&IDs, plot plan, electrical single line diagrams etc.
  • Perform route survey for the proposed location
  • Perform cost estimate
  • Finalise source of power supply and complete ETAP study
  • Site survey report
  • Prepare ITBs
  • Conduct HAZOP and SIL