Madagascar Minerals Illmenite Mine
| Location: | Faut Dauphin, Madagascar |
|---|---|
| Owner: | QIT (Rio Tinto) |
| Lead Contractor: | Mandene JV (Fluor / Hatch) |
| Value: | US$ 86,000,000 |
| Peak Manpower: | 1,400 |
| Duration/Finish: | 30 months/June 2009 |
| Description: | Mechanical, Electrical, Instrumentation, Structural Steel and Piping scope for ‘greenfields’ Titanium Dioxide Mine |
Scope of Work:
S.M.E.I.P
(Steel work erection, mechanical, electrical, instrumentation and piping) of this Greenfields Site including infrastructure, floating wet mining plant and concentrator, dry mineral separation plant and materials handling/export
Supply, detailing, installation and testing of 6,500T steel including pontoons, 1,000T plate-work, 802 pieces of mechanical equipment, 200km cabling, 1,200 instruments, 185 drives, 2,000 lights, 22km of process piping (steel and HDPE) 31,000m2 cladding. Specialist construction activities include: tank field assembly, grouting, scaffolding, NDT, rubber lining, polyurethane lining, conveyor belt and bucket elevator jointing, painting. Kentz has deployed its own capital equipment.