Gautrain Tunnel Ventilation, STMS & SAMS Control Systems
| Location: | Gauteng, South Africa |
|---|---|
| Owner: | Bombela Consortium |
| Lead Contractor: | Bombela Construction JV |
| Value: | $23,000,000 |
| Peak Manpower: | 80-90 |
| Duration/Finish: | 32 months/April 2011 |
| Description: | Contract A: Mechanical Ventilation for Tunnels Contract B: STMS & SAMS Control Systems |

Scope of Work:
Contract A
Complete EPC and startup on a turnkey basis including:
• MCC’s and cabling * Variable Speed Drives for Axial Fans
• Air Diffusion and Sound Attenuation Equipment * Axial Fans
• Fire Rated and LP Galvanised Ducting
• Procurement and manufacture of all equipment to client specification
• Construction and Commissioning
Contract B
Complete Engineering Procurement Construction and startup on a turnkey basis of the whole of the station and tunnel management system for the complete Gautrain, including the 15km tunnel section with three stations and seven emergency evacuation shafts and seven above ground stations from ORTIA through to Hatfield in Pretoria. Includes control of the ventilation systems.