Equate Infrastructure Project. (E.l.S)

 
 
Location:Kuwait
Owner:Equate
Lead Contractor:Fluor Daniel
Value:US $30,000,000
Peak Manpower:685
Duration/Finish:40 months/1998
Description:Petrochemical Complex Infrastructure
Equate Infrastructure Project. (E.l.S)
Scope of Work:

Project management, design engineering, bulk material procurement, construction and commissioning for the electrical and instrumentation scope associated with the petrochemical complex infrastructure. The complex consisted of ethylene unit (650,000 MTA), ethylene glycol unit (340,00 MTA), polyethylene unit (450,000 MTA), utilities unit and a polypropylene unit. All project specifications, design and procurement were to American code and union carbide technology and methods standard.