Equate Infrastructure Project. (E.l.S)

| Location: | Kuwait |
|---|---|
| Owner: | Equate |
| Lead Contractor: | Fluor Daniel |
| Value: | US $30,000,000 |
| Peak Manpower: | 685 |
| Duration/Finish: | 40 months/1998 |
| Description: | Petrochemical Complex Infrastructure |
Scope of Work:
Project Management, Design Engineering, Bulk Material Procurement, Construction and Commissioning for the Electrical and Instrumentation Scope associated with the Petrochemical Complex Infrastructure. The Complex consisted of Ethylene Unit (650,000 MTA), Ethylene Glycol Unit (340,00 MTA), Polyethylene Unit (450,000 MTA), Utilities Unit and a Polypropylene Unit. All project specifications, design and procurement were to American Code and Union Carbide Technology & Methods Standard (TMS).